Our Principles

We always :

Emphazise in understanding customer’s requirement and needs
Provide precise planning and optimal design to fulfill requirement
Provide on-time delivery

Farmatec Customer Ref Photo

CCM PharmaWe have provided the below service for CCM Pharma: 

1)    UPHA PHARMACEUTICAL MFG (M) SDN BHD

a)    Renovate Liquid Plant (2005)
b)    Upgrade Eye Drop Clean Room and HVAC system (Grade B and Grade C) (2005)
c)    Ear Drop Clean Room and HVAC system (Grade D) (2005)
d)    Upgrade Existing Solid and Liquid Plant  HVAC system to meet Grade D quality with Building Automation System; (Fully fresh air system and total project whole RM 3 million) (2006)

* All above projects completed with full validation documentation.

2)    INNOVAX SDN BHD (2007)

Turnkey contractor to design and build HVAC system, come with Building Automation System, cleanroom partition, compressed air system with loop and others M&E services for R&D plant (Grade D and Grade B), Analytical Lab, Bioanalytical Lab, Microlab (include Grade B area). Come with full validation documentation.

3)    UPHA PHARMACEUTICLA MANUFACTURING SDN BHD (2008)

Turnkey contractor to design and build HVAC system for production and warehouse, come with Building Automation System, cleanroom partition, deduster system, compressed air system with loop and others M&E services for Containment plant (Grade D). Come with full validation documentation

4)    UPHA PHARMACEUTICLA MANUFACTURING SDN BHD (RM 205,000) (under CCM Pharma) (2009)

  • Replace all the terminal HEPA and AHU HEPA
  • Duct Cleaning
  • Replace one lot of EPS partition